COMMERCIAL RENOVATION

Full Commercial Fit-out
100+ Workers
4 Week Completion

I called Brian from Future Build knowing that what I was asking was an incredibly challenging task within the time frame. Myself and my business partner Alex were due to takeover an existing nightclub and decided we wanted to completely rebrand and refurbish the premises. In order to minimise the loss of business, we set a very ambitious target to completely rip out the existing contents, build the new design and be back open for business within 4 weeks

Brian (Future Build Specialists, MD) managed to arrange all trades, which included over 100 individuals and contractors, to take part in the project and I’m very happy to say we finished on time and to a very high standard. The team went above and beyond to deliver what we wanted and I highly  recommend Future Build Specialist for any commercial renovation or fit-out needs.

Ben Thompson

Jungle NIGHTCLUB OWNER and TwO door cinema club drummer

Duration:
4 Weeks

Project Value:
£150,000

Location:
Worthing, West Sussex

This commercial renovation had its challenges, mainly the window of opportunity we had to plan, design, execute and complete the project, which in total was just 6 weeks from the initial phone call and allowing just 4 weeks for on site work.

The furniture needed to be strong and we worked with the client to establish a design that was well suited to the space. We decided the seating should mainly consist of booths which we constructed on site using a timber frame, filled and upholstered with high quality leather.

As with any nightclub, you need to pay particular attention to the quality of materials used to ensure the longevity of the space. The bathrooms are a great example of a creative use of these. We used a combination of pre-cast metal, concrete and tiles to create a contemporary industrial feel with long-lasting application. 

Having the large majority of trades and skills in-house really helped us on this job. The end result is a contemporary and luxury aesthetic built with endurance and wear in mind.

The owner of Jungle Nightclub called Future Build in December 2019. Ben, the owner informed us that himself and his business partner, Alex Elsden-Smith, had just taken over the existing Nightclub Liquid Lounge in Worthing, West Sussex and they needed to complete a commercial renovation of the premises by the end of January 2020.

We would be lying if we didn’t admit that we were a little intimidated of adhering to the tight deadlines set, but solidifying our place as a construction company that can adapt and deliver is the core of our business, and this was a challenge that we couldn’t refuse!

We had a total of 100 staff on site over the course of the 4 week project overseen by 2 site managers. We set up a digital link to the site with remote access for the busy owners to over see the job even when they were unavailable to be on site. We are pleased that we were able to complete this job on schedule and under budget.

 

Brian Hearn
Managing Director